Anchor Handling Assessment
Know the Verdict Before the Task
API RP 2SK · IACS UR W22 · DNV offshore mooring chain · EN 12385-4
CAUTION
Governing: Bollard pull required vs available
Utilisation: 0.92
Chain
Wire
Computed Properties
Chain
Wire
Computed Properties
Verdict Table — All 13 Checks
| Check | Demand | Capacity / Limit | Unit | Utilisation | Verdict |
|---|---|---|---|---|---|
| Catenary valid | 12.25 | 150.00 | t | 0.08 | GO |
| Line tension vs line SWL | 150.00 | 305.98 | t | 0.49 | GO |
| Winch line pull at outer layer | 157.50 | 219.32 | t | 0.72 | GO |
| Winch brake at outer layer | 150.00 | 274.15 | t | 0.55 | GO |
| Work wire vs wire SWL | 150.00 | 205.49 | t | 0.73 | GO |
| Wire on drum vs drum capacity | 1500.00 | 2009.04 | m | 0.75 | GO |
| Stern roller resultant vs SWL | 60.62 | 450.00 | t | 0.13 | GO |
| Towing pin side load vs SWL | 23.92 | 100.00 | t | 0.24 | GO |
| Bollard pull required vs available | 183.59 | 200.00 | t | 0.92 | CAUTION |
| Static heel vs limit | 1.37 | 5.00 | ° | 0.27 | GO |
| Aft deck-edge freeboard | 0.50 | 0.76 | m | 0.66 | GO |
| Anchor holding | 111.46 | 450.00 | t | 0.25 | GO |
| Anchor uplift | 50.00 | 906.29 | m | 0.06 | GO |
Screening tool only. Results do not replace the vessel's approved stability booklet, the winch, stern roller and towing pin certificates, the anchor maker's holding curves, the operation-specific procedure or the Master's judgement. Responsibility for the safe conduct of the operation remains with the Master. No liability is accepted for decisions taken on the basis of these results.