Anchor Handling Assessment

Know the Verdict Before the Task

API RP 2SK · IACS UR W22 · DNV offshore mooring chain · EN 12385-4

CAUTION

Governing: Bollard pull required vs available

Utilisation: 0.92

Chain

Wire

Computed Properties

Chain w_air114.94 kg/m
Chain w_sub100.00 kg/m
Chain MBL612.0 t
Wire w_air23.10 kg/m
Wire w_sub19.64 kg/m
Wire MBL411.0 t
w (catenary line)0.1000 t/m
Line MBL612.0 t

Verdict Table — All 13 Checks

CheckDemandCapacity / LimitUnitUtilisationVerdict
Catenary valid12.25150.00t0.08GO
Line tension vs line SWL150.00305.98t0.49GO
Winch line pull at outer layer157.50219.32t0.72GO
Winch brake at outer layer150.00274.15t0.55GO
Work wire vs wire SWL150.00205.49t0.73GO
Wire on drum vs drum capacity1500.002009.04m0.75GO
Stern roller resultant vs SWL60.62450.00t0.13GO
Towing pin side load vs SWL23.92100.00t0.24GO
Bollard pull required vs available183.59200.00t0.92CAUTION
Static heel vs limit1.375.00°0.27GO
Aft deck-edge freeboard0.500.76m0.66GO
Anchor holding111.46450.00t0.25GO
Anchor uplift50.00906.29m0.06GO

Screening tool only. Results do not replace the vessel's approved stability booklet, the winch, stern roller and towing pin certificates, the anchor maker's holding curves, the operation-specific procedure or the Master's judgement. Responsibility for the safe conduct of the operation remains with the Master. No liability is accepted for decisions taken on the basis of these results.