Ballast Water Management Calculator
IMO BWM Convention — D-1 Exchange & D-2 Treatment Plant
Select the applicable IMO BWM Convention standard for this vessel
IMO BWM Convention 2004 (as amended by MEPC.300(72)): D-1 exchange is a transitional measure. All vessels must comply with D-2 treatment standard. D-1 exchange may still be required as a contingency if the BWTS is inoperative. D-2 discharge limits: <10 viable organisms/m³ (≥50 µm); <10/mL (10–50 µm).
D-1 Exchange Standard — Flow-through: pump ≥3× tank volume, achieving ≥95% volumetric exchange. Sequential: ≥3 full pump-out/refill cycles. Must be performed in open ocean ≥200 nm from nearest land, ≥200 m depth.
%
Extra volume / cycles above D-1 minimum
%
Actual vs rated pump capacity
Seawater pumped in continuously while ballast overflows. Efficiency: 1 − e−n where n = volumes pumped. Tanks can run simultaneously — total time = slowest tank.
Tank 1
m³
m³
m³/h
NON-COMPLIANT — One or more tanks do not meet D-1 standard
Method: Flow-Through (≥3× tank volume, ≥95% exchange)
Total Tank Capacity
0 m³
Total Water Flushed
0 m³
Time (parallel)
—
Tanks Assessed
1
| Tank | Capacity | Vol. to Pump | Efficiency | Time | D-1 |
|---|---|---|---|---|---|
| Tank 79e2 | 0 m³ | 0 m³ (0.0×) | 0.0% | — |
Tank 79e2: Increase pump flow rate or safety margin to achieve D-1 compliance.
Responsible Officer Signature
Chief Officer — Date: ___________
Master Signature
Master — Date: ___________